Upper Pond Crossing

This backyard transformation centered around a large custom-designed water feature that serves as the focal point of the property. Our design team utilized 3D modeling to demonstrate how adding a second spillway would elevate the original concept, creating stronger visual impact and more dynamic water movement. The final design features dual spillways, upgraded basalt columns at the headwaters, and cascading falls that flow into multiple pond levels.

An enhanced bridge now spans the upper pond, offering both function and a striking vantage point of the feature. Hydroseed was installed throughout the surrounding yard to complete the landscape and frame the water feature within a lush, natural setting.

Location Completion Date Project Team
Colbert, WA
09/12/2025
PM: Brent Schreiber • Foreman: Mike McCleskey

Services Provided

landscape design and construction, water feature, hydroseed, irrigation, plantings